Contact
Tell us what you have in mind in four steps — no obligation, no endless forms.
Tell us about your project
1/6
More direct
If it's easier for you, message us on WhatsApp. It's more direct and more personal, and we're here to help.
Message us on WhatsAppBefore you write
With a first meeting. We look at the plot — orientation, slope, what the planning rules allow — and listen to what you actually need: rooms, daily routines, budget and timings. That produces a preliminary study you can already make decisions with.
Yes. Our office is in Madrid and we work throughout Spain. Wherever you are, you get the same materials and the same team: our standards don't change with distance.
No. They are homes designed to the Spanish Building Code and built on a reinforced concrete slab, like any other house: real property, with a stamped project and a building permit. What changes is the structure — light timber frame — and that it is assembled dry.
Building a detached home usually takes between five and twelve months, depending on size and ground. Before that come the project and the permit: the project depends on how many rounds we go through together, the permit on the council. The preliminary study gives you a realistic calendar, not a brochure one.
There is no price per square metre that works for everything: it depends on size, plot, brief and finishes. After the first meeting we give you an indicative budget; the firm one comes out of the project and the specification.
We can prepare a tailored financing study for your case. The usual route when you build on your own plot is a self-build mortgage, which the bank releases as the work progresses, against certified stages.